Example Article - Advisement [VC00/BPD28a]

User Acceptance Test Overview

The information below is intended to provide colleges guidance on performing a User Acceptance Test on this business process.  The  business process shown in the flow diagrams below may be only part of what is needed to complete an end-to-end test of a full business cycle.  Coordination with other colleagues at your college in advance of commencing testing is key to success. In the same way that it doesn't  take a single individual to operate the business of running a college it  will require coordination across departments to successfully test a  business flow from beginning to end.

Business Process Flow Diagram

Security Roles Necessary for Testing

The following Quick Reference Guides (QRG) below denote the steps to execute testing.  Below each QRG link the necessary Security Role(s) that are critical for testing the pages/components shown in the QRG. Each QRG may require a different Security Role.

This step in the business process is traditionally completed by administrative assistants in the Instruction Division who perform the class schedule build and assignment of faculty to classes.

Background Configuration Information:

For information on the configuration behind what is seen in this step in the UAT flow process please refer to the following Quick Reference Guide(s):

<add links>

Minimum Test Case (Data) Scenarios:


Recommended Error Test Conditions:

  • Error Condition
    • Expected Behavior
  • Error Condition
    • Expected Behavior

Previous Step in the High Level UAT Framework:

Matriculation (Prog Plan Stack)

Next Step in the High Level UAT Framework:

Enrollment [VC06/BPD21h-i]

Links to User Acceptance Test 'How To' Information:

<add links>