9.2 Processing Large Journals

Purpose: Use this document as a reference for processing or 'unsticking' large General Ledger journal entries in ctcLink.

Audience: Financial Staff

You must have at least one of these local college managed security roles:

  • ZZ GL Journal Entry

You must also set these User Preference Definitions:

If you need assistance with the above security roles or User Preference Definitions, please contact your local college supervisor or IT Admin to request role access.

Processing Large Journals by Budget Check

Navigation: General Ledger > Journals > Process Journals > Budget Check Journals

This can be done when it’s stuck or to prevent it from getting stuck (in other words you can run it instead of running the Edit).  The reason this is helpful is because you can look at the process monitor and see when the budget check is actually completed, thus preventing  you from tripping on it and sending it into “I” status.

Required criteria: Journal should be 'editable' (open boxes), Journal Status 'V' = Valid, and Budget Status 'I' = Incomplete.

  1. The Budget Check Journals run control page displays.
  2. If you have run this process or report in the past, select the Find an Existing Value tab to enter an existing Run Control ID and select the Search button. If this is the first time running this process or report, select the Add a New Value tab to create a new Run Control ID and select the Add button. 
    • NOTE: It is important to note that Run Control IDs cannot be deleted. Do not include spaces in your Run Control. We encourage the Run Control ID to have the same process naming convention but unique to the step; because of this, including your institution code and a short process description in the Run Control ID is recommended--e.g., WA040_BUDGET_CK_JRNLS (College, Process).
  3. The Budget Check Journals Request page displays.
  4. Select the Process Frequency to Process Once.
  5. Enter a meaningful Description.
  6. Enter or lookup valid request parameters, such as:
    • Business Unit.
    • Source.
    • Journal ID From and/or To Journal ID.
  7. Select the Save button.
  8. Select Run.
  9. The Process Scheduler Request page displays. Select OK to run the Commitment Control Budget or FS_BP process. Optional to select the Process Monitor link to view the status. Please refer to the Process Schedule Request steps for further instructions. Once the process runs to success, navigate back to the Journal ID for further processing as needed.
Budget Check Journals Request
  1. Section complete.

Video Tutorial

The video below demonstrates the process actions described in the steps listed above. There is no audio included with this video. Select the play button to start the video.

VIDEO COMING SOON!

View Tutorial via Panopto

View the external link to Processing Large Journals. This link will open in a new tab/window.

0 Comments

Add your comment

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.